I wish I had the time to upload and post the diagrams. I think I need to find a different way to work.
Posted January 27, 2014
http://www.dailycamera.com/boulder-coun ... lin-u-s-36
Work on diverging diamond at McCaslin/U.S. 36 could begin as early as next month.
Construction on unique interchange design could go on for nearly 2 years
If you like the way traffic flows on the McCaslin Boulevard bridge over U.S. 36, you might want to make a few extra trips over it in the next month or so.
Late next month, the major thoroughfare linking Superior to Louisville will begin a dramatic metamorphosis, transforming from a mundane highway crossing to the first diverging diamond interchange on the Front Range.
While it's being built, definitely. It sounds like a great plan in concept, but I have to see it in action - the diagram is way complicated.
"Now, more than ever, the illusions of division threaten our very existence. We all know the truth: more connects us than separates us. But in times of crisis the wise build bridges, while the foolish build barriers. We must find a way to look after one another as if we were one single tribe.” -King T'Challa, Black Panther
The truth is incontrovertible. Malice may attack it. ignorance may deride it, but in the end, there it is. ~Winston Churchill