Line Rebuilding in Deer Creek Canyon area

22 Dec 2020 08:57 #1 by COREElectricCooperative
IREA is rebuilding line to improve reliability and mitigate wildfire risk in the Deer Creek Canyon area. Holes must be dug by hand and poles set via helicopter at several locations. Visit irea.coop/system-improvements/ for more info about improvements IREA is making to the system.

Website: core.coop/
Outage Center: (833) CORE-FIX (267-3349)
This email address is being protected from spambots. You need JavaScript enabled to view it.
Twitter: @CORE Cooperative
Facebook: CORE Electric Cooperative
YouTube: CORE Electric Cooperative
Please check any of the above for the most up-to-date info on outages and other news.
Scam alert: We have received multiple recent reports of scam attempts. Call us directly at (800) 332-9540 if you think you have been targeted by a scam.

Please Log in or Create an account to join the conversation.

Time to create page: 0.138 seconds
Powered by Kunena Forum
sponsors
© My Mountain Town (new)
Google+