Rockscaling on US 285 south of C-470 1/24/2012 from 9-3

24 Jan 2012 18:32 #1 by MountainTownAlerts
Rockscaling on US 285 south of C-470 (Turkey Creek Canyon) tomorrow from 9A-3P. Expect 20 min. delays. Alternate routes advised.


Per Cdot

Please Log in or Create an account to join the conversation.

25 Jan 2012 10:12 #2 by MountainTownAlerts
US 285 Eastbound / Westbound Between CO 8 (Morrison Road) and C-470 (Milemarker 249-250) (through January 2012)9:00am-3:00pm WE and TH Intermittent full closures of the highway for rock scaling operations. 20 minute delays expected throughout the day. Westbound US 285 Detour: Take C-470 north/west to State Highway (SH) 8. Take SH 8 west and south through Morrison back to southbound US 285. Eastbound US 285 Detour: Take SH 8 north through the Town of Morrison and then east on SH 8 to C-470. Take C-470 south/east back to US 285.
Updated : January 25th, 2012 at 8:09

Please Log in or Create an account to join the conversation.

25 Jan 2012 15:48 #3 by MountainTownAlerts
http://d3j5vwomefv46c.cloudfront.net/photos/large/503302670.jpg?Expires=1327532672&Key-Pair-Id=APKAIYVGSUJFNRFZBBTA&Signature=rrmJoU0hb0-SeG-gYbsrDlAlAE0zgsslnospg9r9cdU-PKgixyk-YMO46ptujYlmIBywGttNMGZJcKEfVPkEzMOxJroCOZSFjcQjKaONmws47-ls0JZvUnBZeOB8XD3k1je~jNTLXpPEIHT6mLLxBZhLQ8oG5oHPi1I7Eqxpcr8_

Crews knock down loose rock on US 285 just west of C-470 today. About 80 tons of rock was brought down in the mitigation effort.

The rockfall mitigation work is complete on US 285 just west of C-470. CDOT would like to thank motorists for their patience.

Per CDOT.

http://twitpic.com/8bnitq

Please Log in or Create an account to join the conversation.

Time to create page: 0.146 seconds
Powered by Kunena Forum
sponsors
© My Mountain Town (new)
Google+