CSP Canon City @CSP_CanonCity 8 minutes ago
Update H9 MM 0-7. In consulting with @ColoradoDOT we believe that H9 NB from H50 will open within the hour. However, H9 is still closed 2 miles south of Hartsel. We believe that closure will last until tomorrow.
CSP Canon City @CSP_CanonCity 3 hours ago
UPDATE 2: 717PM Total Closure of H9 (MM0-MM7). Closed from H50 up to FCR 11. Traffic is being turned around and directed back the direction they came. Expect closure to last several hours #TurnAroundDontDrown
UPDATE 1: 7PM H9 MP 7 @ColoradoDOT found the highway covered in water from about MP 4 to MP 7. Do NOT drive through flowing water across the highway.
CSP Canon City @CSP_CanonCity 32 seconds ago
UPDATE 1030PM | H9 @ H50 - now expected to open within 30 minutes to NB traffic.
H9 MM 44 (2 miles S of Hartsel) now expected to open within 60 minutes. @ColoradoDOT crews still hard at work at both affected locations.